Shaoxing Yudong solid waste resource utilization green complex project



  • Project name: Shaoxing Yudong Resource regeneration and utilization green complex project
  • Owner name: Shaoxing Shangyu Environmental Health Management Group Co., LTD
  • Construction time: 2023
  • Time of operation: 2023
  • Source of funds: owner self-financing, government matching funds
  • Construction content: The design of this project adopts the treatment process of "pre-treatment comprehensive sorting + preparation of recycled building materials of aggregates + external transport incineration + resource utilization of inert materials/external transport landfill".
  • The decoration construction waste transported to the treatment plant is first discharged in the raw material storage room between the construction waste disposal vehicles, and the workshop adopts the occluded design.
  • Scale: Construction decoration waste disposal scale of 200 tons/day, large garden placement scale of 10 tons/day, biomass particle preparation and production system disposal scale of 2 tons/day

Process flow:

Process introduction:

  • After the construction decoration waste is disposed of by crushing and screening, recycled aggregate is produced.
  • The large garden waste is broken and sorted, the metal is sorted out, and the combustible material is transported and incinerated to generate electricity.
  • High quality wood from building decoration waste, bulky and garden waste is used for the preparation of biomass fuel rods.