Anhui Tongling construction and decoration waste, large waste comprehensive resource park



  • Project name: Tongling City domestic waste, construction waste transfer treatment project equipment procurement and installation operation and maintenance project
  • Owner name: Tongling City domestic waste, construction waste transfer treatment project equipment procurement and installation operation and maintenance project
  • Construction time: 2020 Operation time: 2022
  • Project location: Banqiao Village, Tianmen Town, Yi 'an District, Tongling City.
  • Source of funds raised by the owner, government matching funds
  • Scale: Construction waste 600,000 tons/year, decoration waste 150,000 tons/year, large waste 15,000 tons/year, recycled bricks 580,000 square meters/year three-line collaborative resource disposal.

Process flow:

  • Process description: After the construction decoration waste is screened, graded broken and screened, the recycled building materials aggregate that can replace natural sand and stone is produced: coarse aggregate and medium aggregate are sold to downstream concrete processing enterprises according to a certain grade to make concrete and as a municipal pavement cushion; Fine aggregate is used as recycled brick base material for recycled brick production, for municipal environment and infrastructure construction such as roadbed and road surface.